Services
Torch On Membranes
The proven bituminous system for roofs, gutters and podiums that take a hammering.
Substrates
Concrete, ply, existing bitumen, insulation (warm roof)
Build-up
Two layer: base sheet and cap sheet
Warranty
20 years system backed
Hot works
Permit, fire watch and daily shutdown
The system
The proven bituminous system for roofs, gutters and podiums that take a hammering.
Torch on is a two-layer reinforced bituminous sheet, heat welded to the substrate and to itself. It is tough, thick and forgiving over uneven concrete — which is why it is still the go-to for internal gutters, plant decks and podiums that carry traffic.
Every job runs under a hot works permit with our own fire watch, extinguishers and a documented shutdown at the end of each day. On occupied buildings we sequence around the tenants rather than the other way round.
Where we use it
Internal gutters
Concrete roofs
Podium slabs
Plant decks
Parapets and upstands
Remedial overlays
What you get
The parts of the job that decide whether it lasts.
Hot works managed
Permits, fire watch and extinguishers supplied by us, with a written shutdown each day.
Two-layer build-up
Base and cap sheet with staggered laps — not a single layer dressed up as a system.
Flood tested
Flood or spray testing where practical, with photos of every detail before cover-up.
How it goes in
Four steps, and one crew accountable for all of them.
01
Substrate assessment
Moisture, cure and falls checked, and any ponding areas identified before we quote a build-up.
02
Prep and prime
Grinding, patching, fillets to upstands and bitumen primer across the whole area.
03
Two-layer application
Base sheet and cap sheet torched and rolled, with staggered laps and full bond confirmed.
04
Flood test and sign-off
Flood or spray testing where practical, photos of every detail and a producer statement.
Common questions
What builders usually ask us.
Is open flame a problem on an occupied building?
It is managed, not ignored. We work to a hot works permit, keep our own fire watch on site for an hour after we stop, and where flame is genuinely unsuitable we will price a self-adhesive or liquid alternative instead.
Can you overlay a failed bitumen roof?
Usually yes. If the existing sheet is well bonded and dry, an overlay is faster and cheaper than a strip out. Wet insulation has to come out — we will core test and tell you which it is.
How does it handle ponding?
Better than most systems, but ponding is still a falls problem. If the deck holds water we will quote screeds or tapered insulation to fix the cause.
Got a gutter, podium or concrete roof to price?
Kind words