Skip to main content
Tauranga · Serving the central North Island
Services

Torch On Membranes

The proven bituminous system for roofs, gutters and podiums that take a hammering.
Substrates
Concrete, ply, existing bitumen, insulation (warm roof)
Build-up
Two layer: base sheet and cap sheet
Warranty
20 years system backed
Hot works
Permit, fire watch and daily shutdown
Home
/
Services
/
Torch On Membranes
The system

The proven bituminous system for roofs, gutters and podiums that take a hammering.

Torch on is a two-layer reinforced bituminous sheet, heat welded to the substrate and to itself. It is tough, thick and forgiving over uneven concrete — which is why it is still the go-to for internal gutters, plant decks and podiums that carry traffic.
Every job runs under a hot works permit with our own fire watch, extinguishers and a documented shutdown at the end of each day. On occupied buildings we sequence around the tenants rather than the other way round.
Where we use it
Internal gutters
Concrete roofs
Podium slabs
Plant decks
Parapets and upstands
Remedial overlays
What you get

The parts of the job that decide whether it lasts.

Hot works managed

Permits, fire watch and extinguishers supplied by us, with a written shutdown each day.

Two-layer build-up

Base and cap sheet with staggered laps — not a single layer dressed up as a system.

Flood tested

Flood or spray testing where practical, with photos of every detail before cover-up.
How it goes in

Four steps, and one crew accountable for all of them.

01

Substrate assessment

Moisture, cure and falls checked, and any ponding areas identified before we quote a build-up.
02

Prep and prime

Grinding, patching, fillets to upstands and bitumen primer across the whole area.
03

Two-layer application

Base sheet and cap sheet torched and rolled, with staggered laps and full bond confirmed.
04

Flood test and sign-off

Flood or spray testing where practical, photos of every detail and a producer statement.
Common questions

What builders usually ask us.

Is open flame a problem on an occupied building?

It is managed, not ignored. We work to a hot works permit, keep our own fire watch on site for an hour after we stop, and where flame is genuinely unsuitable we will price a self-adhesive or liquid alternative instead.

Can you overlay a failed bitumen roof?

Usually yes. If the existing sheet is well bonded and dry, an overlay is faster and cheaper than a strip out. Wet insulation has to come out — we will core test and tell you which it is.

How does it handle ponding?

Better than most systems, but ponding is still a falls problem. If the deck holds water we will quote screeds or tapered insulation to fix the cause.

Got a gutter, podium or concrete roof to price?

Kind words

What clients, councils and main contractors say.

5.0
★★★★★
Google Reviews
Posted on Google Google
Craig Ross profile picture
Craig Ross
952 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Posted on Google Google
Navnit singh profile picture
Navnit singh
1681 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Home
Posted on Google Google
derek&irene Beaven profile picture
derek&irene Beaven
3275 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
The Best. Excellent team of guys who know what they're doing.
Approved product suppliers
© Copyright 2011 – 2026 ARID Technologies. All rights reserved.
Privacy Policy
Website by Digital Pie