The system

Basements, retaining walls and lift pits sealed properly — because you only get one shot at it.

Below-ground work is unforgiving. Once the backfill goes in, a defect means excavating a finished structure, so tanking is about detailing and sequencing far more than it is about the product.
We tank retaining walls, basements, lift pits and planters using sheet, liquid and cementitious systems, with drainage and protection layers installed as part of the same package rather than left to someone else.
Where we use it
Basement walls
Retaining walls
Lift pits
Planter boxes
Podium slabs
Water tanks
What you get

The parts of the job that decide whether it lasts.

Sequenced with the build

We book in around your pour and backfill dates and hold them — the whole job depends on it.

Drainage included

Drainage board and protection layers quoted in, not left as someone else's scope.

Inspected before cover

Photographic record of every detail before backfill, plus a producer statement.
How it goes in

Four steps, and one crew accountable for all of them.

01

Site & substrate check

We look at the substrate, the drainage and the programme before recommending a system.
02

Preparation

Grinding, patching, priming and fillets — the part that decides whether the membrane lasts.
03

Membrane install

Sheet or liquid applied by licensed applicators, with every penetration and junction detailed.
04

Protection & sign-off

Drainage board, protection layer, then photos and a producer statement for your file.
Common questions

What builders usually ask us.

When do you need to be on site?

After the walls are stripped and cured, before drainage and backfill. Give us the pour dates early and we will slot in without holding up the excavator.

Sheet or liquid tanking?

Liquid suits complex shapes and tight boundaries; sheet suits big clean walls and blind-side work. We will recommend based on your access and detailing, not stock on hand.

What if the wall is already backfilled?

Then we look at negative-side options — cavity drain systems and crystalline slurries internally. It is more work than doing it right first time, but it is fixable.

Basement, retaining wall or lift pit to tank?

Kind words

What clients, councils and main contractors say.

5.0
★★★★★
Google Reviews
Posted on Google Google
Craig Ross profile picture
Craig Ross
983 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Posted on Google Google
Navnit singh profile picture
Navnit singh
1712 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Home
Posted on Google Google
derek&irene Beaven profile picture
derek&irene Beaven
3306 days ago
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
The Best. Excellent team of guys who know what they're doing.
Approved product suppliers
© Copyright 2011 – 2026 ARID Technologies. All rights reserved.
Privacy Policy
Website by Digital Pie