Iline Construction brought Arid in to waterproof every deck across the three-block Victoria Street development — 24 separate deck areas, each with its own outlets, upstands and door thresholds to detail.
On a repeated detail like this, consistency is the whole job. The same build-up, the same lap positions and the same threshold detail on every deck, so the inspection record reads identically from block to block.
We installed Sealco TPO at 1.5mm thick, hot-air welded, with every deck probe tested and photographed before handover to the following trades.