Skip to main content
Tauranga · Serving the central North Island
Torch on & TPO Operational building

Mount Maunganui Fire Station

Roof overlay and deck membrane on a working fire station — with the station fully operational throughout.

Home / Projects / Mount Maunganui Fire Station

Main contractor

Marra Construction

Architect

APG Architects

Client

Fire and Emergency NZ

Location

Mount Maunganui

Systems

Sealco · Viking

The brief

A station that could not close, and a roof that could not wait.

Water ingress at the roof and upper deck needed fixing as part of wider strengthening works — on a building that had to stay operational around the clock.

We installed a Sealco single layer torch on overlay to the roof area and Viking Enviroclad TPO at 1.5mm thick to the deck, sequencing hot works around the station’s operations with Marra Construction.

Hot works permits, fire watch and a documented shutdown every day — non-negotiable on any job, and doubly so on a fire station.

Scope of works

Sealco single layer torch on overlay to roof Viking Enviroclad TPO 1.5mm to deck area Hot works permits and daily fire watch Upstand and penetration detailing Sequencing around a 24/7 operational station Photographic QA record and sign off

How we did it

Sequenced around the main contractor, not the other way round.

01

Access planning

Work zones and hot works agreed with Marra and the station so trucks could always respond.

02

Roof overlay

Sealco torch on overlay installed over the existing roof, detail by detail.

03

Deck membrane

Viking Enviroclad TPO welded across the upper deck and terminated at the upstands.

04

Test and sign off

Laps probe tested, photographed and signed off as part of the strengthening works.