Tauranga City Council
Joyce Road Water Reservoir
A fully waterproof lid on the council reservoir, delivered alongside Conspec Construction and laid clean by the Arid crew.
View project →
The Manawa development needed three different waterproofing packages, each specified for its own exposure: internal gutters, precast panel joints and channel drains.
We installed Nuralite double layer torch on to the gutters, Sika firerated sealant to the precast panel joints, and Sika Sikalastic 152 to the channel drains — one crew accountable for all three, booked in around Marra’s precast and roofing sequence.
Each package was detailed, tested and photographed separately, so the QA record for every system stands on its own.