Conspec brought Arid in to waterproof the reservoir lid: a large, trafficked concrete deck sitting over stored drinking water, with dozens of penetrations, upstands and a hard programme date before commissioning.
Anything that leaked would mean excavating a finished structure. The membrane had to be a system with a long track record, installed by licensed applicators, with every weld tested and documented.
We specified Sika Sarnafil, mechanically fixed with hot-air welded laps, and detailed every penetration by hand before the protection layer went down.